Among the conceptual and logistic tasks of this major project, the safe operation within the data processing infrastructure had to be assured. As a 'link' between project basis and project management we coached the staff, which had to work with the 'old' and the 'new world' in parallel, during the whole roll-out-phase.
Already in advance we were able to clarify issues, intercept and analyze arising problems and solve them on-site. If required we developed appropriate tools and integrated them into the system.
The direct communication with the project management ensured a smooth project flow in compliance with the timelines. Thus the project could be completed successfully on schedule.